Projects

The following are a list of recently successfully completed projects:

 

  • Bowen Front Beach Sea Wall
  • Hervey Bay Sea wall and Boat Ramp
  • Nathan Rd Sporting Complex ground preperation and Wetland
  • Sunshine Coast Airport – Flood Mitigation Works
  • Newport Waterways Sand Canal Trial Beach Restoration
  • Captain Cook Park Seawall Extension Anzac Parade
  • Construction of Redcliffe Aerodrome Levee Bank Emergency Works
  • Margate Whytecliffe Parade Scott’s Point Seawall
  • Newport Waterways Canal Beach Restoration Stage 2
  • Redcliffe Foreshore Dunal System Reconstruction
  • Removal and disposal of dredge spoil from Griffith Road Dredge spoil pond
  • Spinnaker Drive Park Foreshore Protection Works
  • Construction of Cabbage Tree Creek Bank Stabilisation Works
  • Bongaree Sea Wall Construction
  • Newport Water Seaway Dredging

Contact Us

 

    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.